Wednesday, October 21, 2009
The Outside is coming along
The siding is going on!!
The 2x6 at the top of the vinyl will get wrapped with white metal/vinyl and then white board and batten siding will go in the gable.
The upstairs dormer
Another shot of the upstairs dormer
The rear of the house
The far side of the house with the rear nursery/study area
The far right side of the house
We are getting there
The Kitchen (there will be a bar height countertop on the beadboard knee wall)
The island will all be at one level...the base isn't built yet for one side.
The Master Bath
The Master Bath Vanity
Window Trim detail.
Interior Door Style
Exterior door from the inside
Exterior Door from the outside.
Monday, October 12, 2009
Micro Hood Vent
The line on the right is at the upper edge of the cabinets and the venting is several inches proud of that line.
On the right side the venting is flanked by a 2x4 and on the left side by the wire for the microhood.
from the face of the current 90 to the front of the wall is approximately 3 inches
The full depth of the wall in nearly 5" thick (the depth of a 2x4, the OSB sheathing, and the sheetrock).
Below is a rough sketch of the proposed periscope.
Thursday, September 24, 2009
Now I can have a garage band
For those about to Rock...we salute you
Before
After
Before
After
Before
After
Sometimes when talking about hanging sheetrock or drywall people simply refer to it as "rocking." Applying the tape and mud is sometimes called "slinging mud." Therefore I can say that I we have been "hanging, rocking, and slinging mud." What fun!!
Friday, September 4, 2009
The laying of the pipe
Before
After
Waste Tube was still past the wall and will interfere with sheetrock install, but the plumber pulled it back with a metal strap.
Friday, August 28, 2009
Time to Cool Down